Results of electrical tests for each tape are stored in our local DB  and can be accessed by clicking on the tape number in the lists of tapes below. The data are also stored in the SCT data-base under TESTs (only raw data).

Production

 FORWARD:

  Production of Cu tapes   NEW!

   Yield plot

  1. 161 tapes sent to Taiwan in June 2005  List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 190,  Electrically tested: 178 (93%), Electrically OK: 172 (91%),  Alignment OK: 164 (86%), Visually OK: 161 (85%) 

  2.   480 tapes sent to Taiwan on  11th of July  2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 600 Optical Inspection OK: 518 (86%), Electrically OK: 505 (84%),   Visually OK: 480 (80%) 

 3.   384 tapes sent to Taiwan on 1st of  August 2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 460 Optical Inspection OK and Viusal OK: 385 (84%), Electrically OK: 384 (83%). 

4.   405 tapes sent to Taiwan on 22nd of  August 2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 440 Optical Inspection OK and Viusal OK: 411 (93%), Electrically OK: 405 (92%). 

5.  400 tapes sent to Taiwan on 5th of  September 2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 440 Optical Inspection OK: 403 (92%) , Viusal OK: 402 (91%), Electrically OK: 400 (91%). 

6. 399 tapes sent to Taiwan on 19th of  September 2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 440 Optical Inspection OK, Viusal OK and Electrically OK: 399 (91%). 

7. 683 tapes sent to Taiwan on 3rd of  October 2005 List of tapes,  QA plots.

          Yield calculation:

           Tapes produced: 740 Optical Inspection OK, Viusal OK and Electrically OK: 683 (92%). 

 

 

 

    Aluminium Tapes

    Please note that forward tapes: a) have 8 traces on both layers, b) HV line is wider (0.75 mm) than other thin lines (0.5 mm)

    Shipments:

  1. 480 tapes sent to Taiwan in October 2003.   List of tapes.  QA plots
  2. 529 tapes sent to Taiwan in November 2003.   List of tapes.  QA plots
  3. 359 tapes sent to Tawian in December 2003.  List of tapes,  QA plots.   There are 4 bad tapes in this shipment: 
      1. 20220212559632
      2. 20220212483556
      3. 20220212483568
      4. 20220212483572
  4. 545 tapes sent to Taiwan in February 2004. List of tapes,  QA plots. There are 2 bad tapes in this shipment:
      1. 20220212817572
      2. 20220212452562
  5. 562 tapes sent to Taiwan in May 2004. List of tapes,  QA plots.
  6.   27 tapes sent to Taiwan in December 2004. List of tapes,  QA plots.
  7. 190 tapes sent to Taiwan in May 2005. List of tapes,  QA plots.

-----------------------------------------------------------------------------------------------------------------------------

    BARREL:

   Shipments:

  1. 240 tapes sent to Taiwan in January   2003.       List of tapes.  QA plots
  2. 240 tapes sent to Taiwan in February 2003.      List of tapes.   QA plots
  3. 560 tapes sent to Taiwan in March 2003.          List of tapes.  QA plots
  4. 484 tapes sent to Taiwan in April 2003.            List of tapes.  QA plots
  5. 539 tapes sent to Taiwan in May 2003.            List of tapes.  QA plots
  6. 578 tapes sent to Taiwan in June 2003.            List of tapes.  QA plots
  7. Extra shipment of 136 barrel tapes to Taiwan in December 2003.            List of tapes.  QA plots

    ______________________________________________________________________________

   

Preseries

    60 tapes sent to Taiwan in April 2002. List of tapes.  QA plots